Fauna Spotter Catching
Our client is a multinational engineering, construction and project management corporation and key contractor for a major mine site development in Moranbah, west of Mackay. Ecosure were subcontracted to provide
Our client is a multinational engineering, construction and project management corporation and key contractor for a major mine site development in Moranbah, west of Mackay. Ecosure were subcontracted to provide
Ecosure was engaged to undertake a literature review, habitat assessment, platypus and turtle survey (including bank observation, snorkelling and overnight deployment of baited cathedral traps and fyke nets) to establish
Ecosure was engaged to undertake desktop assessments and field surveys to establish the aquatic ecological values of waterways intersected by a number of our client’s proposed gas pipelines. Field investigations
Energex engaged Ecosure’s ecological restoration team to revegetate a large site at Tamborine Village Substation on Mount Tamborine in the Gold Coast hinterland. The project aimed to return the site
Large Site Revegetation at Tamborine Village Substation Read More »
Ecosure’s client is a major energy provider and operator of key power stations around the Rockhampton and Gladstone region. They required a manual to be written that enabled the ongoing
Ecosure’s environmental consultants were engaged to conduct surveys for Commonwealth (EPBC) listed species and ecological communities (flora and fauna) on a mining lease at Meteor Downs, west of Rockhampton. Surveys
Supplementary Flora and Fauna Surveys / Meteor Downs Read More »
Ecosure’s team of environmental consultants have been working with a number of clients during construction projects on Gold Coast Airport land from 2006 to present. Our role has included acting
Construction Environmental Compliance Monitoring Read More »
Our client, a multinational property and infrastructure development company, engaged Ecosure to provide fauna spotter catcher services for the construction of a 26 km stretch of rail duplication in Central
Our clients are developing gas fields and constructing a number of long distance high pressure gas pipelines, to take gas from the Surat and Bowen basins in Central Queensland to
Ecosure’s team of environmental consultants worked with our client, a national construction company, to prepare a series of environmental management plans specific to the construction of a bypass. These sub
Construction Environmental Management Plans (CEMPs) Read More »